Vol 16 No 1 (2010)
Published: 2010-03-31
Articles
The driving factors of china's public‐private partnership projects in Metropolitian transportation systems: Public sector's viewpoint
Abstract 860 | PDF Downloads 588 | DOI https://doi.org/10.3846/jcem.2010.01
Page 5-18
The public sector's perspective on procuring public works projects – comparing the views of practitioners in Hong Kong and Australia
Abstract 638 | PDF Downloads 478 | DOI https://doi.org/10.3846/jcem.2010.02
Page 19-32
Risk assessment of construction projects
Abstract 4166 | PDF Downloads 2420 | DOI https://doi.org/10.3846/jcem.2010.03
Page 33-46
Subcontractor selection practices in international construction projects
Abstract 787 | PDF Downloads 864 | DOI https://doi.org/10.3846/jcem.2010.04
Page 47-56
Construction contractor prequalification from polish clients’ perspective
Abstract 611 | PDF Downloads 344 | DOI https://doi.org/10.3846/jcem.2010.05
Page 57-64
Influence of quality performance on clients’ patronage of indigenous and expatriate construction contractors in Nigeria
Abstract 516 | PDF Downloads 298 | DOI https://doi.org/10.3846/jcem.2010.06
Page 65-73
Customer behavior and decision making in the refurbishment industry‐a data mining approach
Abstract 787 | PDF Downloads 484 | DOI https://doi.org/10.3846/jcem.2010.07
Page 75-84
Precast concrete systems in developing vs. industrialized countries
Abstract 1042 | PDF Downloads 745 | DOI https://doi.org/10.3846/jcem.2010.08
Page 85-94
Global optimization of grillages using simulated annealing and high performance computing
Abstract 463 | PDF Downloads 678 | DOI https://doi.org/10.3846/jcem.2010.09
Page 95-101
Saosys toolbox as Matlab implementation in the elastic‐plastic analysis and optimal design of steel frame structures
Abstract 459 | PDF Downloads 414 | DOI https://doi.org/10.3846/jcem.2010.10
Page 103-121
Evaluation of PFWD as potential quality control tool of pavement layers
Abstract 530 | PDF Downloads 298 | DOI https://doi.org/10.3846/jcem.2010.11
Page 123-129
Design of people evacuation from rooms and buildings
Abstract 615 | PDF Downloads 397 | DOI https://doi.org/10.3846/jcem.2010.12
Page 131-139
Required additional heating power of building during intermitted heating
Abstract 482 | PDF Downloads 341 | DOI https://doi.org/10.3846/jcem.2010.13
Page 141-148
Non‐linear analysis of suspension bridges with flexible and rigid cables
Abstract 610 | PDF Downloads 501 | DOI https://doi.org/10.3846/jcem.2010.14
Page 149-154