1.
Bożejko W, Hejducki Z, Uchroński M, Wodecki M. Solving resource-constrained construction scheduling problems with overlaps by metaheuristic. JCEM [Internet]. 2014Jul.4 [cited 2024Nov.19];20(5):649-5. Available from: https://ijspm.vgtu.lt/index.php/JCEM/article/view/3159