Vol 30 No 2 (2024)
Published: 2024-02-06
Articles
Buffering policies for prefabricated construction supply chain subject to material lead time and activity duration uncertainties
Abstract 299 | PDF Downloads 284 | DOI https://doi.org/10.3846/jcem.2024.20809
Page 99–113
Probabilistic management of pavement defects with image processing techniques
Abstract 277 | PDF Downloads 306 | DOI https://doi.org/10.3846/jcem.2024.20401
Page 114–132
The benefit evaluation framework of using performance-based contracting in urban road maintenance
Abstract 165 | PDF Downloads 169 | DOI https://doi.org/10.3846/jcem.2024.20491
Page 133–148
Determining concessionary items for “availability payment only” PPP projects: a holistic framework integrating value-for-money and social values
Abstract 244 | PDF Downloads 239 SM Downloads 56 | DOI https://doi.org/10.3846/jcem.2024.20841
Page 149–167
Empirical study toward corporate legal compliance and anti-corruption for top construction engineering consulting firms
Abstract 282 | PDF Downloads 248 | DOI https://doi.org/10.3846/jcem.2024.19554
Page 168–181
Structural equation model-based performance measurement system for transferring PPP water projects: a China perspective
Abstract 194 | PDF Downloads 183 | DOI https://doi.org/10.3846/jcem.2024.19788
Page 182–199