[1]
Hadad, Y. and Friedman, L. 2005. Method for forecasting the time standard of multi‐characteristic item. Technological and Economic Development of Economy. 11, 1 (Mar. 2005), 26-31. DOI:https://doi.org/10.3846/13928619.2005.9637679.